Delivery and set-up

From our door
to your space.

Kyma is in stock and ships across Europe. No plumbing and no building works: once it is in place, it fills from a hose and plugs into a standard socket.

10–15 days
Europe, from order confirmation
In stock
Ships as soon as your order is confirmed
Kerbside
Delivered on a pallet
Placement
Quoted with delivery for your access
How it works

Six steps.

Each step is confirmed with you before the next one starts.

  1. 01 Enquiry and delivery quoteTell us your postcode and access. We reply with a delivery quote and, if you want it, a placement quote.
  2. 02 Written confirmationPrice, delivery and placement confirmed in writing before you order.
  3. 03 Delivery date agreedWe agree a delivery date with you.
  4. 04 Kerbside deliveryKyma arrives on a pallet at the kerb.
  5. 05 Placement and set-up, if bookedQuoted separately with delivery, once we know your access.
  6. 06 Fill and set the temperatureFill from a hose, plug in, set the temperature. Around 90 minutes to 2 °C with the cover on.
Delivery terms

What delivery includes.

Everything is quoted and confirmed in writing before you order.

Lead timeIn stock. Europe: 10–15 days from order confirmationIn stock. Europe: 10–15 days from order confirmation
Outside the EUOn enquiry, subject to certificationOn enquiry, subject to certification
How it arrivesOn a pallet, delivered to kerbsideOn a pallet, delivered to kerbside
Delivery costQuoted for your postcode and access, confirmed in writing before you orderQuoted for your postcode and access, confirmed in writing before you order
Placement and set-upQuoted with delivery once we know your accessQuoted with delivery once we know your access
Before delivery

Preparing your space.

If anything here is uncertain, tell us when you enquire and we work it out with you.

Kyma side elevation
Download technical specification (PDF)
Space200 × 78 × 74 cm, plus 1 m on the chiller side for airflow and 30 cm on the drain side
FloorLevel, rated for 540 kg in use. For upper floors or roof terraces, check with your architect or building engineer
PowerA standard 230 V / 50 Hz socket. Kyma draws 1,000 W; no dedicated circuit or electrician needed
WaterA garden hose to fill. Kyma drains through its own outlet in about 40 minutes
Permanent installationA floor drain is recommended
Access routeDoorways, stairs and turns from the kerb to the final position. We check this with you when we quote
Technical specification (PDF)
Setting the temperature on the Kyma touchscreen
First fill

Ready in about 90 minutes.

  1. 01 01 · FillFill from a garden hose to the operating level, 320 L.
  2. 02 02 · Plug inInto a standard 230 V socket.
  3. 03 03 · Set the temperatureOn the touchscreen or in the app. Around 90 minutes to 2 °C from a typical fresh fill, with the cover on.
Care and maintenance
Questions

About delivery.

All FAQs
How long is delivery?
In stock. Europe: 10–15 days from order confirmation, delivered on a pallet to kerbside. Placement and set-up are quoted with delivery once we know your postcode and access. Outside the EU: on enquiry, subject to certification.
Do I need a plumber?
No. Kyma fills from a garden hose and drains through its own outlet, in about 40 minutes. There is no fixed plumbing, so it can be placed, moved or taken with you.
Will my floor take the weight?
Kyma weighs 125 kg empty and about 450 kg filled. The floor should be level and rated for 540 kg in use, which is within the design load of most ground floors and reinforced terraces. For upper floors or roof terraces, ask your architect or building engineer; we can supply the technical PDF.
What power does it need?
A standard 230 V / 50 Hz socket. The unit draws 1,000 W in operation (1 HP motor, 3,150 W cooling capacity). No dedicated circuit or electrician is needed.